● Technical Service
Renewable
Energy Solutions
From substation switchgear to feeder reclosers, we install, test, and energize medium- and high-voltage electrical infrastructure engineered to hold under East Africa’s toughest grid conditions.
YOUR GATEWAY TO UTILITY-GRADE POWER INFRASTRUCTURE
Engineered to energize, built to last.
Aamplix Power holds active installation and commissioning contracts with UEDCL, UETCL, UMEME, ERA Uganda, and the Bank of Uganda — delivering work that is inspected, tested, and signed off before a single load is switched on.
Utility & institutional contracts delivered
Max voltage class commissioned to date
Fault response for live networks
Live Network ReadyIEC / IEEE Aligned Protocols
Planning a Substation or Feeder Upgrade?
Tell us the voltage class, scope and site conditions — we’ll come back with an engineering assessment and a realistic commissioning timeline.
Our Services
Have a Question?
Need more information about our power solutions? Our team is ready to assist you.
✉️ Leave a message and we’ll get back to you shortly.
Download Our Product Catalogue
Catalogue downloads are being finalised — check back soon, or contact us directly for product literature.
Reliable Installation & Commissioning for Live Networks
Every installation Aamplix Power delivers is planned around one principle: nothing gets energized until it has been physically verified and electrically proven.
That discipline is what has kept our work compliant across UEDCL, UETCL and Bank of Uganda contracts — from single feeder upgrades to multi-site substation rollouts. Our field teams carry calibrated test equipment to every site — megohmmeters, primary injection kits and thermal cameras — so protection settings, insulation values and connection integrity are confirmed on the spot, not assumed on paper.
Every install follows IEC 60694, IEC 62271 and IEEE C37 test protocols. We provide full as-built drawings, test certificates and O&M manuals on completion. Our range of services covers MV switchgear, protection systems, transformer commissioning and live network fault response across Uganda and East Africa.
Voltage Class
11kV – 33kV medium voltage, extendable to select HV scopes
Equipment Types
RMUs, LBS, VT/CT sets, power & distribution transformers, switchgear
Standards
IEC 60694, IEC 62271, IEEE C37, utility-specific SOPs
Test Methods
Insulation resistance, primary injection, relay calibration, thermal scan
Typical Timeline
2–6 weeks depending on site count and equipment lead time
Frequently Asked Questions
What does electrical commissioning actually involve?
Commissioning is the verification stage after physical installation — insulation testing, protection relay calibration and controlled energization — that confirms equipment performs safely under real load before it’s handed over for operational use.
Which standards govern your testing procedures?
We test to IEC 60694 and IEC 62271 for switchgear, IEEE C37 for protection coordination, and the specific technical SOPs required by UEDCL, UETCL and other utility clients we work under.
How long does installation and commissioning typically take?
Most single-site feeder or panel projects run 2–3 weeks from mobilization to energization. Multi-site substation programmes are scoped individually based on site count, equipment lead times and outage windows.
Do you provide as-built documentation and O&M manuals?
Yes — every handover includes as-built single-line diagrams, test certificates for each protection function, and an operations & maintenance manual specific to the installed equipment.